top of page
Search

Monitoring the Med-WET Pilot Operation: Instream Wetland Tech for Waste Water Treatment

  • Writer: MED-WET
    MED-WET
  • Aug 30, 2023
  • 1 min read

Updated: Jan 5, 2024

The project team had a mission during (3-5 August 2023) to the installation site (research experimental pilot for waste water treatment using instream Wetland technology). The aim of this mission is to follow up on the proper operation of the pilot and to take water samples to test the treatment efficiency. The mission achieved its goal, and the water samples had been delivered to the certified regional laboratory of the National Water Research Centre for water quality analysis.



 
 
 

Comentarios

Obtuvo 0 de 5 estrellas.
Aún no hay calificaciones

Agrega una calificación
Asset.png
MED-WET logo-TRANSPARENT-WHITE.png
prima_logo_v2.png

PRIMA programme is supported by Horizon 2020, the European Union’s Framework Programme for Research and Innovation.

  • MED-WET Website - Icons-20
  • MED-WET Website - Icons-21
  • MED-WET Website - Icons-19

Join Us on the Journey

Publisher
Wismar University
University of Applied Sciences: Technology, Business and Design
represented by the Rector
Prof. Dr. jur. Bodo Wiegand-Hoffmeister
PO Box 1210
23952 Wismar
Phone +49 (0)3841 753-7218

Editorial office: Regina Krause
Phone +49 (0)3841 753-7644
Email: regina.krause@hs-wismar.de

Texts and pictures: Team MED-WET, WIX
Web design: Andreas Fritz-Blessmann,

                              Lisa Theuma

email:  viafritz@gmail.com,               lisa.theuma@mcast.edu.mt

© 2023 copyright by Andreas Fritz-Blessmann & Lisa Theuma

bottom of page